Government Orders

Water Resources Department

Date

26-12-2023

G.O.(2D)No.59

Water Resources Department - Revised Administrative Sanction for Special Desilting Works in Thamiraparani Basin at an estimated cost of Rs.1,03,32,315/- with an excess of Rs.6,02,315/- over the administrative sanction amount of Rs.97,30,000/- – Accorded – Orders issued.

Date

20-12-2023

G.O.(Ms)No.90

Water Resources Department - Revised Administrative Sanction for Formation of a new Tank in Kasthurirengapuram Part-II Village in Tisaiyanvilai Taluk of Tirunelveli District at an estimated cost of Rs.4,84,40,000/- – Accorded – Orders issued.

Date

20-12-2023

G.O.(4D)No.43

Water Resources Department - Revised Administrative Sanction for 8 Nos. of Rehabilitation works in Trichy Region at an estimated cost of Rs.15,51,09,126/- - Accorded – Orders issued.

Date

20-12-2023

G.O.(4D)No.42

Water Resources Department - Revised Administrative Sanction for Construction of Bridges across small rivers in Virudhunagar and Coimbatore Districts at an estimated cost of Rs.5,99,63,221/- Accorded – Orders issued.

Date

18-12-2023

G.O. (Rt) No.539

Water Resources Department – North-East Monsoon – Appointment of Engineers to assist flood relief works at Thirunelveli, Thoothukudi and Kanniyakumari Districts – Sanction accorded – Orders – Issued.

Date

21-11-2023

G.O.(Ms)No.88

Water Resources Department - Revised Administrative Sanction for Excavation of a New Link Canal from Urmelalagiyan Tank to Karunkulam Tank in Kadayanallur Taluk of Tenkasi District at an estimated cost of Rs.2,03,49,368/- – Accorded – Orders issued.

Date

09-11-2023

G.O.(Ms) No.83

Water Resources Department — 10 Nos. of Flood mitigation works at an estimated cost of Rs.249.00 lakh in Chennai, Kancheepuram and Thiruvallur Districts – Administrative and Financial Sanction accorded — Orders issued

Date

09-11-2023

G.O.(Ms) No.84

Water Resources Department — 12 Nos. of Flood mitigation works at an estimated cost of Rs.315.10 lakh to clear water hyacinth and other floating debris in the Adayar and Cooum River – Administrative and Financial Sanction accorded — Orders issued

Date

09-11-2023

G.O.(Ms)No.85

Water Resources Department - Revised Administrative Sanction for rehabilitation and standardization of 50 minor irrigation tanks in Sivagangai and Tiruppur Districts of Madurai Region at an estimated cost of Rs.33,62,59,010/- – Accorded – Orders issued.

Date

02-11-2023

G.O.(Ms)No.81

Water Resources Department - Revised Administrative Sanction for Flood Protection Works to Kadambakulam surplus course, Marudur Melakal in Thoothukudi District at an estimated cost of Rs.36,43,60,000/- – Accorded – Orders issued.

Date

05-10-2023

G.O.(2D)No.52

Water Resources Department – Payment of fees and expenses of Rs.2,73,082/- to the Arbitrator in O.P.No.273/2019 and A.F.No.178 of 2019 relating to the dispute arising out of the work for Rehabilitation of Thovalai Channel system tanks from L.S.0/000 Km to 38/400 Km in Thovalai Taluk of Kanyakumari District – Administrative Sanction - Orders Issued.

Date

03-10-2023

G.O.(Ms)No.71

Water Resources Department – Conducting regular Surveying and Levelling Operations for the Plan Formulation Wing for every year - Administrative and Financial Sanction for a sum of Rs.1,30,00,000/- for the year 2023 – 2024 accorded - Orders issued.

Date

22-09-2023

G.O.(Ms)No.69

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Formation / widening of Supply channel to feed 18 Tanks in Virudhunagar District benefitted by Nilaiyur – Kambikudi Extension Channel at an estimated cost of Rs.9.8655 Crore – Administrative and Financial Sanction – Accorded - Orders issued

Date

22-09-2023

G.O.(4D)No.31

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – 16 Rehabilitation works in Madurai, Thoothukudi, Tirunelveli, Tenkasi, Sivagangai, Dindigul, Kanniyakumari, Ramanathapuram and Virudhunagar Districts, pertaining to Madurai Region for Rs.56.9575 Crore under NABARD loan assistance – Administrative and Financial Sanction – Accorded - Orders issued.

Date

19-09-2023

G.O.(4D)No.30

Water Resources Department – Rehabilitation and Modernisation of 7 works in Tiruppur, Thanjavur, Salem, Virudhunagar, Dindigul and Kanniyakumari Districts at an estimates cost of Rs.49.0479 Crore under NABARD loan assistance - Administrative and Financial Sanction accorded - Orders issued.

Date

11-09-2023

G.O.(Ms) No.67

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Construction of Check Dams at 15 places in 8 Districts at an estimated cost of Rs.69.352 Crore under NABARD loan assistance – Administrative and Financial Sanction – Accorded - Orders issued.

Date

08-09-2023

G.O.(4D)No.28

Water Resources Department – Announcement schemes for 2021 – 2022 Rehabilitation of shutters and hoisting arrangements in vent no.1 to 41 of Barrage across Cauvery at Upper Anicut in Srirangam Taluk of Trichy District for Rs.16,80,94,000/- under NABARD loan assistance - Administrative and Financial Sanction accorded - Orders issued.

Date

07-09-2023

G.O.(Ms)No.65

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Construction of an Anicut across Kallukulam Vari at L.S 1.85Km to feed Thenangadu Eri in Kuruvikkarambai Village of Peravurani Taluk in Thanjavur District at an estimated cost of Rs.3.352 crore under NABARD loan assistance under RIDF XXIX for the year 2023 - 2024 – Administrative and Financial Sanction – Accorded - Orders-issued

Date

01-09-2023

G.O.(Ms)No.59

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Construction of 2 canals to improve the irrigation sources in Tenkasi and Virudhunagar Districts at an estimated cost of Rs.2.7808 Crore – Administrative and Financial Sanction – Accorded - Orders issued

Date

01-09-2023

G.O.(Ms)No.60

Water Resources Department - Revised Administrative Sanction for Construction of Anicut across Vaigai River to feed Keelapasalai and other tanks in Manamadurai Village and Taluk in Sivagangai District at an estimated cost of Rs.24,43,70,000/-Accorded – Orders issued.

Date

01-09-2023

G.O.(2D)No.45

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Flood Mitigation and Renovation works, in the affected areas of Cuddalore, Trichy, Mayiladuthurai, Virudhunagar and Tirunelveli Districts at an estimated cost of Rs.57.2425 crore – Administrative and Financial Sanction – Accorded - Orders issued.

Date

01-09-2023

G.O.(Ms)No.61

Water Resources Department - Revised Administrative Sanction for the work of Construction of a Check Dam across Koundanya River near Sedhukkarai Village in Gudiyatham Taluk of Vellore District at an estimated cost of Rs.11,58,00,000/- – Accorded – Orders issued.

Date

31-08-2023

G.O.(Ms)No.58

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Construction of Tail End Regulators to arrest sea water intrusion at two places in Nagapattinam and Thanjavur Districts at an estimated cost of Rs.13.0222 Crore under NABARD loan assistance RIDF XXIX for the year 2023-2024 – Administrative Sanction – Accorded - Orders issued.

Date

30-08-2023

G.O.(D) No.194

Tamil Nadu Water Resources Department - Dam Rehabilitation and Improvement Project II -Sanction for training related expenses in connection with various trainings under DRIP II Project for the period from April 2023 to March 2025 at an estimated cost of Rs.150.00 lakh -Accorded- Orders- Issued.

Date

30-08-2023

G.O.(D) No.192

TNIAMP- Incremental Operating cost for the year 2023-24, 2024-25 for hiring of vehicles, procurement of consumables and providing Internet facilities etc., for State Ground and Surface Water Resources Data Centre under A1 Component of TNIAM Project at an estimated amount of Rs.26.35 lakhs- Administrative Sanction– Accorded- Orders –Issued.

Date

30-08-2023

G.O.(D) No.193

Tamil Nadu Water Resources Department – Dam Rehabilitation and Improvement Project Phase II - State Project Management Unit (SPMU)-Operating cost for the year 2023-2024 –Amount of Rs.129.96 lakh- Administrative Sanction – Accorded- Orders- Issued.

Date

30-08-2023

G.O.(D) No.195

Tamil Nadu Water Resources Department – Dam Rehabilitation and Improvement Project (DRIP) - Administrative and Financial Sanction for meeting the expenses in connection with the Safety Inspection of dams by the Dam Safety Review Panel (DSRP) under DRIP Phase II until the completion of DRIP-II at an estimated cost of Rs.25.00 lakhs Accorded - Orders– Issues .

Date

23-08-2023

G.O.(2D)No.44

Water Resources Department – Payment of fees Rs.7,50,000/- to the Arbitrator in O.P.No.108 of 2017 and A.F.No.8 of 2018 relating to the dispute arising out of the work for Construction of Barrage across river Cauvery at 250m downstream of existing Kattalai Bed Regulator in Mayanur Village of Krishnapuram Taluk in Karur District – Administrative Sanction - Orders Issued

Date

22-08-2023

G.O.(D)No.188

Water Resources Department – Announcement made by the Hon’ble Minister for Water Resources for 2022 – 2023 - Special Desilting works in Madurai Region at an estimated cost of Rs.2.959 Crore - Administrative and Financial Sanction accorded - Orders issued – Amendment to Government Order - Issued

Date

18-08-2023

G.O.(D) No.186

TN IAM Project – Block Administrative Sanction for Implementation of Model Village Programme to 103 villages in Phase-III sub basins of World Bank funded TN IAMP through line Departments at an estimated cost of Rs.206.00 lakhs – Financial Sanction of Rs.52.00 lakhs to Water Resources Department – Accorded – Orders – Issued.

Date

18-08-2023

G.O.(Ms)No.56

Water Resources Department - Revised Administrative Sanction for Construction of a Check dam across the Gowsiga River near Kuppampatti Village in Virudhunagar Taluk and District at an estimated cost of Rs.3,15,00,000/- Accorded – Orders issued.

Date

07-08-2023

G.O.(Ms)No.54

Water Resources Department - Revised Administrative Sanction for Construction of a check dam across Agaram River near Govindambadi Village in Anicut Taluk of Vellore District at an estimated cost of Rs.11,60,00,000/- – Accorded – Orders issued.

Date

03-08-2023

G.O.(D) No. 173

Water Resources Department — Announcements Schemes for the year 2023 - 2024 — Providing flood regulators in 8 Tanks viz. Ottiyambakkam, Perumbakkam, Kattur, Ambattur, Ayanampakkam, Ayapakkam, Partipattu, Korattur in Chengalpattu, Thiruvallur and Chennai Districts at an estimated cost of Rs.11,43,24,562/— — Administrative Sanction accorded — Orders issued.

Date

03-08-2023

G.O. (D) No.173

Water Resources Department – Announcements Schemes for the year 2023-2014 – Providing flood regulators in 8 Tanks viz. Ottiyambakkam, Perumbakkam, Kattur, Ambattur, Ayanampakkam, Ayapakkam, partipatty, Korattur in Chengalpatty, Thiruvallur and Chennai Districts at an estimated cost of Rs.11,43,24,562/- - Administrative Sanction accorded – Orders issued.

Date

03-08-2023

G.O. (D) No.172

Water Resources Department – Announcements Schemes 2023- 2024- four Permanent Flood Protection works in Gerugambakkam and Kolapakkan areas of Adyar Sub-Basin in Kancheepuram District at an estimated cost of Rs.69.45 Crore – Administrative, and Financial Sanction accorded – Orders issued.

Date

03-08-2023

G.O. (D) No.172

Water Resources Department — Announcements Schemes 2023 - 2024 — Four Permanent Flood Protection works in Gerugambakkam and Kolapakkam areas of Adyar Sub-Basin in Kancheepuram District at an estimated cost of Rs.69.45 Crore — Administrative, and Financial Sanction accorded — Orders issued.

Date

20-06-2023

G.O.(2D)No.32

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for the year 2023 – 2024 – Rehabilitation works in 12 Irrigation Structures in Trichy Region at an estimated cost of Rs.57.4063 crore under NABARD loan assistance – Administrative Sanction – Accorded - Orders issued

Date

20-06-2023

G.O.(Ms)No.41

Water Resources Department – Announcement made by the Hon’ble Minister for Water Resources for 2023-2024 - Construction of bridges, causeways across small rivers and streams, road and foot path on bunds at 4 places in two Districts at an estimated cost of Rs.48.36 Crore- Administrative Sanction accorded - Orders issued.

Date

20-06-2023

G.O.(Ms)No.42

Water Resources Department – Announcement made by the Hon’ble Minister for Water Resources for 2023-2024 - Conversion of Madhavaram Retteri into drinking water source by deepening the Bed and Providing Regulator arrangements and improvements to foreshore area of Madhavaram Tank in Madhavaram Taluk of Chennai District at an estimated cost of Rs.43,19,02,000/- - Administrative Sanction accorded - Orders issued.

Date

13-06-2023

G.O.(2D)No.28

Water Resources Department – Payment of fees and expenses of Rs.4,00,082/- to the Arbitrator in A.F.No.179 of 2019 relating to the dispute arising out of the work for Construction of bridge, retaining wall and road with B.T Surface from Kalimar Bridge to Symon colony bridge at Colachel in Kanniyakumari District – Administrative Sanction - Orders Issued.

Date

12-06-2023

G.O.(D)No.121

Water Resources Department – Mullai Periyar Dam – Engaging Expert Instruments Consultancy Services for obtaining status of the Existing Instruments in Mullai Periyar Dam for submitting detailed report to the Supervisory Committee for an amount of Rs.16.00 Lakh- Sanction accorded – Orders issued.

Date

12-06-2023

G.O.(D) No.120

Water Resources Department – Administrative Sanction for a sum of Rs.51.00 lakhs to engage a consultant to carry out concurrent evaluation for Repair, Renovation and Restoration works in 100 water bodies under Phase-IX of Har Khet Ko Pani component of Pradhan Mantri Krishi Sinchayee Yojana - Accorded – Orders-Issued.

Date

29-05-2023

G.O.(2D)No.23

Water Resources Department – Rehabilitation and Restoration of Twin Tanks and Renovation works to the causeway across Ponnai River Vellore District at an estimated cost of Rs.4139.84 lakh – NABARD loans assistance to State Fund - Financial sanctions accorded - Orders issued.

Date

23-05-2023

G.O.(D) No.95

Water Resources Department – World Bank - TNIAMP- Administrative Sanction to take up the works in Nandhiyar Kulaiyar Sub basin at an estimated cost of Rs.74.30 crore under phase IV of World Bank funded TN IAMP-Accorded – Orders- Issued.

Date

18-05-2023

G.O.(Ms) No.28

Water Resources Department.— Pre-Monsoon preparedness works at an estimated cost of Rs.20.00 Crore in Chennai and Sub Urban areas and other Districts of Chennai Region - Sanction accorded -Orders issued. .

Date

18-05-2023

G.O (Ms) No.28

Water Resources Department - Pre-Monsoon preparedness works at an estimated cost of Rs.20.00/- crore in Chennai and Sub Urban areas and other Districts of Chennai Region – Sanction accorded – Orders issued.

Date

18-05-2023

G.O.(D) No.103

Tamil Nadu Water Resources Department - Revised Administrative Sanction for a sum of Rs.11148.45 lakh including additional requirement of Rs.1055.78 lakh under State Fund against original Administrative Sanction of Rs.10092.67 lakh to take up 100 tanks for Repair, Renovation and Restoration (RRR) Scheme under Phase IX of Har Khet Ko Pani (HKKP) component of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)- Accorded- Orders- Issued.

Date

11-05-2023

G.O.(D) No.96

Water Resources Department – Sanction of Institutional Membership Fee of Rs.23,600/- for Indian Committee on Large Dams (INCOLD) for the calendar year 2023 and permitting the Chief Engineer, Plan Formulation, Water Resources Department and the Chief Engineer, Operation and Maintenance, Water Resources Department Chennai as the representatives of Tamil Nadu Water Resources Department of Institutional Membership in the Indian Committee on Large Dams – Accorded – Orders – Issued.

Date

09-05-2023

G.O.(4D)No.8

Water Resources Department – Announcement made by the Hon’ble Minister (Water Resources) for 2022 – 2023 - Kancheepuram District – Construction of Anicut across Thollazhi Maduvu near Ullavur Village in Walajabad Taluk at an estimated cost of Rs.7.00 crore – Administrative and Financial Sanction accorded - Orders issued.

Date

08-05-2023

G.O.(Ms)No.25

Water Resources Department - Revised Administrative Sanction for Construction of Check dam and Recharge shafts across Vaigai River for recharge of ground water near Aarapalayam of Madurai West Taluk in Madurai District at an estimated cost of Rs.12,53,27,399/-– Accorded – Orders issued.

Date

08-05-2023

G.O.(2D)No.15

Water Resources Department – Mullai Periyar Dam – Purchase of Electronic Total Station for the study of deflection at Periyar Dam at an estimated cost of Rs.8.75 Lakh - Administrative and Financial Sanction accorded – Orders Issued.

Date

13-04-2023

G.O.(D)No.77

Water Resources Department – Constitution of High Level Technical Committee to probe the design flaws in the original project to establish accountability for the Kattalai Barrage near Mayanur Village of Krishnarayapuram Taluk in Karur District – Additional extension of time upto 30.04.2023 – Permission granted - Orders issued

Date

03-04-2023

G.O.(D)No.74

Announcement made by the Hon’ble Minister for Water Resources for 2022-2023 – Construction of two Anicuts in Madurai Region at an estimated cost of Rs.4,96,14,000/- - Administrative and Financial sanction accorded - Amendment to G.O (4D) No.96, Water Resources (S2) Department, dated 17.11.2022 – Orders issued.

Date

31-03-2023

G.O.(Ms)No.16

Water Resources Department - Carrying out Additional quantity and additional items of work at an estimated cost of Rs.9,11,75,654/- for the work of Extension, Renovation and Modernisation of Kumarapalayam vaikkal and Mohanur vaikkal in Raja Vaikkal Irrigation system in Cauvery Basin in Paramathivelur and Mohanur Taluks of Namakkal District - Administrative Sanction– Accorded – Orders issued.

Date

28-03-2023

G.O. (Ms) No.15

Water Resources Department– Dynamic Ground Water Resources Assessment for Tamil Nadu as on March, 2022 – Categorization of Firkas as Over Exploited, Critical, Semi-Critical, Safe and Saline/ Poor Quality based on the Assessment in Tamil Nadu – Approved – Orders issued.

Date

27-03-2023

G.O.(Ms)No.14

Water Resources Department - Carrying out Additional quantity and additional items of work at an estimated cost of Rs.3,29,44,976/- for the work of “Extension, Renovation and Modernisation of Raja vaikkal and Poiyeri vaikkal in Raja Vaikkal Irrigation system in Cauvery Basin in Paramathivelur and Mohanur Taluk of Namakkal District - Administrative Sanction– Accorded – Orders issued

Date

24-03-2023

G.O.(D)No.64

Water Resources Department - Construction of a new Regulator across Southern and Northern arms of Coleroon River on the downstream side of existing Regulator at Mukkombu (Upper Anicut) in Trichy District - Revised Administrative Sanction for Rs.414.00 Crore orders issued in G.O (Ms) No.97, Water Resources (S2) Department, dated.06.12.2022 – Amendment to G.O. – Orders Issued.

Date

02-03-2023

G.O.(4D)No.3

Water Resources Department – Villupuram District – Renovation of Sornavur Anicut across Thenpennaiyar River in Sornavur Village in Villupuram Taluk and District at a cost of Rs.39.00 crore – Administrative Sanction accorded - Orders issued.

Date

14-02-2023

G.O.(D) No.33

Water Resources Department – Administrative Sanction for a sum of Rs.99.50 lakhs to engage a consultant to carry out concurrent evaluation for Repair, Renovation and Restoration works in 100 water bodies under Phase VIII of Har Khet Ko Pani component of Pradhan Mantri Krishi Sinchayee Yojana - Accorded – Orders-Issued.

Date

30-01-2023

G.O.(4D)No.1

Water Resources Department – Announcement made by Hon’ble Minister for Water Resources for 2022-2023 – Construction of an Anicut across Vaigai river to feed Kattikulam, Milaganur and other Tanks in Manamadurai Taluk of Sivagangai District at an estimated cost of Rs.30,60,00,000/- - Administrative and Financial sanction accorded - Orders issued

Date

27-01-2023

G.O.(D) No.23

Sub Basins of Tamil Nadu Track Work Progress and Impact Assessment in the TN IAM Project Area GIS enabled Web Portal with Mobile Application at a cost of under Component C - Project Management Support of TN IAMP Accorded Orders Issued.

Date

20-01-2023

G.O.(D)No.19

Announcement made by Hon’ble Minister for Water Resources for 2022-2023 – Construction of two Anicuts in Madurai Region at an estimated cost of Rs.4,96,14,000/- - Administrative and Financial sanction accorded - Amendment to G.O (4D) No.96, Water Resources (S2) Department, dated 17.11.2022 – Orders issued